ISTQB Learning

Test your knowledge

0%
323
Created on By Admin

Exam 1

1 / 40

1. Which TWO of the following tasks belong MAINLY to a testing role?

Select TWO options.

2 / 40

2. What task may management take on during a formal review?

Select ONE option.

3 / 40

3. Consider the following testware.

Which test activity produces this testware as an output?

Select ONE option.

4 / 40

4. In many software organizations the test department is called the Quality Assurance (QA) department. Is this sentence correct or not and why?

Select ONE option.

5 / 40

5. You work in a team that develops a mobile application for food ordering. In the current iteration the team decided to implement the payment functionality.

Which of the following activities is a part of test analysis?

Select ONE option.

6 / 40

6. Your team uses planning poker to estimate the test effort for a newly required feature. There is a rule in your team that if there is no time to reach full agreement and the variation in the results is small, applying rules like “accept the number with the most votes” can be applied.
After two rounds, the consensus was not reached, so the third round was initiated. You can see the test estimation results in the table below.

Which of the following is the BEST example of the next step?

Select ONE option.

7 / 40

7. Which of the following statements about formal reviews is TRUE?

Select ONE option.

8 / 40

8. Which of the following is NOT true regarding the test pyramid?

Select ONE option.

9 / 40

9. Which of the following is a benefit of early and frequent feedback?

Select ONE option.

10 / 40

10. Which of the following BEST describe the collaborative approach to user story writing?

Select ONE option.

11 / 40

11. Which test activity does a data preparation tool support?

Select ONE option.

12 / 40

12. Which TWO of the following options are common metrics used for reporting on the quality level of the test object?

Select TWO options.

13 / 40

13. You were given a task to analyze and fix causes of failures in a new system to be released.

Which activity are you performing?

Select ONE option.

14 / 40

14. A phone ringing in a neighboring cubicle distracts a programmer causing him to improperly program the logic that checks the upper boundary of an input variable. Later, during system testing, a tester notices that this input field accepts invalid input values.

Which of the following correctly describes an incorrectly coded upper bound?

Select ONE option.

15 / 40

15. In your project there has been a delay in the release of a brand-new application and test execution started late, but you have very detailed domain knowledge and good analytical skills. The full list of requirements has not yet been shared with the team, but management is asking for some test results to be presented.

Which test technique fits BEST in this situation?

Select ONE option.

16 / 40

16. Which of the following is a characteristic of experience-based test techniques?

Select ONE option.

17 / 40

17. You are testing a mobile application that allows customers to access and manage their bank accounts. You are running a test suite that involves evaluating each screen, and each field on each screen, against a general list of user interface best practices derived from a popular book on the topic that maximizes attractiveness, ease-of-use, and accessibility for such applications. Which of the following options BEST categorizes the test technique you are using?

Select ONE option.

18 / 40

18. Which of the following statements describe a valid test objective?

Select ONE option.

19 / 40

19. Which of the following statements about branch testing is CORRECT?

Select ONE option.

20 / 40

20. Which of the following factors (i-v) have SIGNIFICANT influence on the test process?

i. The SDLC
ii. The number of defects detected in previous projects
iii. The identified product risks
iv. New regulatory requirements forcing formal white-box testing
v. The test environment setup

Select ONE option.

21 / 40

21. Which of the following pieces of information contained in a test progress report is the LEAST useful for business representatives?

Select ONE option.

22 / 40

22. Which of the following options shows an example of test activities that contribute to success?

Select ONE option.

23 / 40

23. Which of the following BEST explains a benefit of independence of testing?

Select ONE option.

24 / 40

24. Consider the following user story:

As an Editor
I want to review content before it is published
so that I can assure the grammar is correct

and its acceptance criteria:

• The user can log in to the content management system with "Editor" role
• The editor can view existing content pages
• The editor can edit the page content
• The editor can add markup comments
• The editor can save changes
• The editor can reassign to the "content owner" role to make updates

Which of the following is the BEST example of an ATDD test for this user story?

Select ONE option.

25 / 40

25. Decide which of the following statements (i-v) are true for static testing.

i. Abnormal external behaviors are easier to identify with this testing
ii. Discrepancies from a coding standard are easier to find with this testing
iii. It identifies failures caused by defects when the software is run
iv. Its test objective is to identify defects as early as possible
v. Missing coverage for critical security requirements is easier to find and fix

Select ONE option.

26 / 40

26. Your team uses the three-point estimation technique to estimate the test effort for a new high-risk feature. The following estimates were made:

• Most optimistic estimation: 2 person-hours
• Most likely estimation: 11 person-hours
• Most pessimistic estimation: 14 person-hours

What is the final estimate?

Select ONE option.

27 / 40

27. Consider the following test categories (1-4) and agile testing quadrants (A-D):

1. Usability testing
2. Component testing
3. Functional testing
4. Reliability testing

A. Agile testing quadrant Q1: technology facing, supporting the development team
B. Agile testing quadrant Q2: business facing, supporting the development team
C. Agile testing quadrant Q3: business facing, critique the product
D. Agile testing quadrant Q4: technology facing, critique the product

How do the following test categories map onto the agile testing quadrants?

Select ONE option.

28 / 40

28. Which of the following BEST describes the concept behind error guessing?

Select ONE option.

29 / 40

29. Which of the arguments below would you use to convince your manager to organize retrospectives at the end of each release cycle?

Select ONE option.

30 / 40

30. Your test suite achieved 100% statement coverage. What is the consequence of this fact?

Select ONE option.

31 / 40

31. Which types of failures (1-4) fit which test levels (A-D) BEST?

1. Failures in system behavior as it deviates from the user’s business needs
2. Failures in communication between components
3. Failures in logic in a module
4. Failures in not correctly implemented business rules

A. Component testing
B. Component integration testing
C. System testing
D. Acceptance testing

Select ONE option.

32 / 40

32. Which of the following is the BEST example of how traceability supports testing?

Select ONE option.

33 / 40

33. A wine storage system uses a control device that measures the wine cell temperature T (measured in °C, rounded to the nearest degree) and alarms the user if it deviates from the optimal value of 12, according to the following rules:

• if T = 12, the system says, “optimal temperature”

• if T < 12, the system says, “temperature is too low!”

• if T > 12, the system says, “temperature is too high!”

You want to use the 3-point boundary value analysis (BVA) to verify the behavior of the control device. A test input is a temperature in °C provided by the device.

What is the MINIMAL set of test inputs that achieves 100% of the desired coverage?

Select ONE option.

34 / 40

34. The following is a list of the work products produced in the SDLC.

i. Business requirements
ii. Schedule
iii. Test budget
iv. Third-party executable code
v. User stories and their acceptance criteria

Which of them can be reviewed?

Select ONE option.

35 / 40

35. How is the whole team approach present in the interactions between testers and business representatives?

Select ONE option.

36 / 40

36. Which of the following is NOT an example of the shift left approach?

Select ONE option.

37 / 40

37. You need to update one of the automated test scripts to be in line with a new requirement. Which process indicates that you create a new version of the test script in the test repository?

Select ONE option.

38 / 40

38. You work as a tester in a project on a mobile application for food ordering for one of your clients. The client sent you a list of requirements. One of them, with high priority, says

“The order must be processed in less than 10 seconds in 95% of the cases”.

You created a set of test cases in which a number of random orders were made, the processing time measured, and the test results were checked against the requirements.

What test type did you perform?

Select ONE option.

39 / 40

39. You are testing a system that calculates the final course grade for a given student.

The final grade is assigned based on the final result, according to the following rules:

• 0 – 50 points: failed
• 51 – 60 points: fair
• 61 – 70 points: satisfactory
• 71 – 80 points: good
• 81 – 90 points: very good
• 91 – 100 points: excellent

You have prepared the following set of test cases:

What is the 2-value Boundary Value Analysis (BVA) coverage for the final result that is achieved with the existing test cases?

Select ONE option.

40 / 40

40. Which work product can be used by an agile team to show the amount of work that has been completed and the amount of total work remaining for a given iteration?

Select ONE option.

0%