1. Which TWO of the following options are common metrics used for reporting on the quality level of the test object?

Select TWO options.

2 / 40

2. Which of the following is NOT true regarding the test pyramid?

Select ONE option.

3 / 40

3. Which of the following factors (i-v) have SIGNIFICANT influence on the test process?

i. The SDLC
ii. The number of defects detected in previous projects
iii. The identified product risks
iv. New regulatory requirements forcing formal white-box testing
v. The test environment setup

Select ONE option.

4 / 40

4. Consider the following user story:

As an Editor
I want to review content before it is published
so that I can assure the grammar is correct

and its acceptance criteria:

• The user can log in to the content management system with "Editor" role
• The editor can view existing content pages
• The editor can edit the page content
• The editor can add markup comments
• The editor can save changes
• The editor can reassign to the "content owner" role to make updates

Which of the following is the BEST example of an ATDD test for this user story?

Select ONE option.

5 / 40

5. You were given a task to analyze and fix causes of failures in a new system to be released.

Which activity are you performing?

Select ONE option.

6 / 40

6. You received the following defect report from the developers stating that the anomaly described in this test report is not reproducible.

Application hangs up
2022-May-03 – John Doe – Rejected
The application hangs up after entering “Test input: $ä” in the Name field on the new user creation screen. Tried to log off, log in with test_admin01 account, same issue. Tried with other test admin accounts, same issue. No error message received; log (see attached) contains fatal error notification. Based on the test case TC-1305, the application should accept the provided input and create the user. Please fix with high priority, this feature is related to REQ-0012, which is a critical new business requirement.

What critical information is MISSING from this test report that would have been useful for the developers?

Select ONE option.

7 / 40

7. During risk analysis the team considered the following risk: “The system allows too high a discount for a customer”. The team estimated the risk impact to be very high.

What can one say about the risk likelihood?

Select ONE option.

8 / 40

8. Which of the following is NOT a benefit of static testing?

Select ONE option.

9 / 40

9. Your organization’s test strategy suggests that once a system is going to be retired, data migration shall be tested. As part of what test type is this testing MOST likely to be performed?

Select ONE option.

10 / 40

10. Your favorite bicycle daily rental store has just introduced a new Customer Relationship Management system and asked you, one of their most loyal members, to test it.
The implemented features are as follows:

• Anyone can rent a bicycle, but members receive a 20% discount
• However, if the return deadline is missed, the discount is no longer available
• After 15 rentals, members get a gift: a T-Shirt

Decision table describing the implemented features looks as follows:

Based ONLY on the feature description of the Customer Relationship Management system, which of the above rules describes an impossible situation?

 

Select ONE option.

11 / 40

11. Which of the following BEST describe the collaborative approach to user story writing?

Select ONE option.

12 / 40

12. Which of the following pieces of information contained in a test progress report is the LEAST useful for business representatives?

Select ONE option.

13 / 40

13. A wine storage system uses a control device that measures the wine cell temperature T (measured in °C, rounded to the nearest degree) and alarms the user if it deviates from the optimal value of 12, according to the following rules:

• if T = 12, the system says, “optimal temperature”

• if T < 12, the system says, “temperature is too low!”

• if T > 12, the system says, “temperature is too high!”

You want to use the 3-point boundary value analysis (BVA) to verify the behavior of the control device. A test input is a temperature in °C provided by the device.

What is the MINIMAL set of test inputs that achieves 100% of the desired coverage?

Select ONE option.

14 / 40

14. You are testing a user story with three acceptance criteria: AC1, AC2 and AC3. AC1 is covered by test case TC1, AC2 by TC2, and AC3 by TC3. The test execution history had three test runs on three consecutive versions of the software as follows:

Tests are repeated once you are informed that all defects found in the test run are corrected and a new version of the software is available.
Which of the above tests are executed as regression tests?

Select ONE option.

15 / 40

15. Which of the following BEST describes the way acceptance criteria can be documented?

Select ONE option.

16 / 40

16. The reviews being used in your organization have the following attributes:

• There is the role of a scribe
• The main purpose is to evaluate quality
• The meeting is led by the author of the work product
• There is individual preparation
• A review report is produced

Which of the following review types is MOST likely being used?

Select ONE option.

17 / 40

17. Consider the following rule: “for every SDLC activity there is a corresponding test activity”. In which SDLC models does this rule hold?

Select ONE option.

18 / 40

18. Which of the following is an example of how product risk analysis influences thoroughness and scope of testing?

Select ONE option.

19 / 40

19. Which of the following BEST explains a benefit of independence of testing?

Select ONE option.

20 / 40

20. Which of the following statements describe a valid test objective?

Select ONE option.

21 / 40

21. Consider the following test categories (1-4) and agile testing quadrants (A-D):

1. Usability testing
2. Component testing
3. Functional testing
4. Reliability testing

A. Agile testing quadrant Q1: technology facing, supporting the development team
B. Agile testing quadrant Q2: business facing, supporting the development team
C. Agile testing quadrant Q3: business facing, critique the product
D. Agile testing quadrant Q4: technology facing, critique the product

How do the following test categories map onto the agile testing quadrants?

Select ONE option.

22 / 40

22. How is the whole team approach present in the interactions between testers and business representatives?

Select ONE option.

23 / 40

23. Which types of failures (1-4) fit which test levels (A-D) BEST?

1. Failures in system behavior as it deviates from the user’s business needs
2. Failures in communication between components
3. Failures in logic in a module
4. Failures in not correctly implemented business rules

A. Component testing
B. Component integration testing
C. System testing
D. Acceptance testing

Select ONE option.

24 / 40

24. Which of these statements is NOT a factor that contributes to successful reviews?

Select ONE option.

25 / 40

25. Which of the following statements about branch testing is CORRECT?

Select ONE option.

26 / 40

26. Which of the following is a characteristic of experience-based test techniques?

Select ONE option.

27 / 40

27. You have been assigned as a tester to a team producing a new system incrementally. You have noticed that no changes have been made to the existing regression test cases for several iterations and no new regression defects were identified. Your manager is happy, but you are not. Which testing principle explains your skepticism?

Select ONE option.

28 / 40

28. The following list contains risks that have been identified for a new software product to be developed:

i. Management moves two experienced testers to another project
ii. The system does not comply with functional safety standards
iii. System response time exceeds user requirements
iv. Stakeholders have inaccurate expectations
v. Disabled people have problems when using the system

Which of them are project risks?

Select ONE option.

29 / 40

29. Which of the following is NOT an example of the shift left approach?

Select ONE option.

30 / 40

30. Which of the following BEST describes the concept behind error guessing?

Select ONE option.

31 / 40

31. You are testing a system that calculates the final course grade for a given student.

The final grade is assigned based on the final result, according to the following rules:

• 0 – 50 points: failed
• 51 – 60 points: fair
• 61 – 70 points: satisfactory
• 71 – 80 points: good
• 81 – 90 points: very good
• 91 – 100 points: excellent

You have prepared the following set of test cases:

What is the 2-value Boundary Value Analysis (BVA) coverage for the final result that is achieved with the existing test cases?

Select ONE option.

32 / 40

32. Which of the following are advantages of DevOps?

i. Faster product release and faster time to market
ii. Increases the need for repetitive manual testing
iii. Constant availability of executable software
iv. Reduction in the number of regression tests associated with code refactoring
v. Setting up the test automation framework is inexpensive since everything is automated

Select ONE option.

33 / 40

33. You need to update one of the automated test scripts to be in line with a new requirement. Which process indicates that you create a new version of the test script in the test repository?

Select ONE option.

34 / 40

34. Which of the following options shows an example of test activities that contribute to success?

Select ONE option.

35 / 40

35. Which of the following is NOT true for white-box testing?

Select ONE option.

36 / 40

36. Which of the following is a benefit of early and frequent feedback?

Select ONE option.

37 / 40

37. Which of the following statements about formal reviews is TRUE?

Select ONE option.

38 / 40

38. A phone ringing in a neighboring cubicle distracts a programmer causing him to improperly program the logic that checks the upper boundary of an input variable. Later, during system testing, a tester notices that this input field accepts invalid input values.

Which of the following correctly describes an incorrectly coded upper bound?

Select ONE option.

39 / 40

39. What task may management take on during a formal review?

Select ONE option.

40 / 40

40. Which test activity does a data preparation tool support?

Select ONE option.