ISTQB Learning

Test your knowledge

0%
321
Created on By Admin

Exam 1

1 / 40

1. Which of the following is a benefit of early and frequent feedback?

Select ONE option.

2 / 40

2. Which of the following options shows an example of test activities that contribute to success?

Select ONE option.

3 / 40

3. You are testing a mobile application that allows users to find a nearby restaurant based on the type of food they want to eat. Consider the following list of test cases, priorities (i.e., a smaller number means a higher priority), and dependencies:

Which of the following test cases should be executed as the third one?

Select ONE option.

4 / 40

4. Consider the following user story:

As an Editor
I want to review content before it is published
so that I can assure the grammar is correct

and its acceptance criteria:

• The user can log in to the content management system with "Editor" role
• The editor can view existing content pages
• The editor can edit the page content
• The editor can add markup comments
• The editor can save changes
• The editor can reassign to the "content owner" role to make updates

Which of the following is the BEST example of an ATDD test for this user story?

Select ONE option.

5 / 40

5. Which TWO of the following options are common metrics used for reporting on the quality level of the test object?

Select TWO options.

6 / 40

6. A phone ringing in a neighboring cubicle distracts a programmer causing him to improperly program the logic that checks the upper boundary of an input variable. Later, during system testing, a tester notices that this input field accepts invalid input values.

Which of the following correctly describes an incorrectly coded upper bound?

Select ONE option.

7 / 40

7. You are testing a user story with three acceptance criteria: AC1, AC2 and AC3. AC1 is covered by test case TC1, AC2 by TC2, and AC3 by TC3. The test execution history had three test runs on three consecutive versions of the software as follows:

Tests are repeated once you are informed that all defects found in the test run are corrected and a new version of the software is available.
Which of the above tests are executed as regression tests?

Select ONE option.

8 / 40

8. Consider the following part of a test plan.

Testing will be performed using component testing and component integration testing. The regulations require to demonstrate that 100% branch coverage is achieved for each component classified as critical.

Which part of the test plan does this part belong to?

Select ONE option.

9 / 40

9. You were given a task to analyze and fix causes of failures in a new system to be released.

Which activity are you performing?

Select ONE option.

10 / 40

10. A wine storage system uses a control device that measures the wine cell temperature T (measured in °C, rounded to the nearest degree) and alarms the user if it deviates from the optimal value of 12, according to the following rules:

• if T = 12, the system says, “optimal temperature”

• if T < 12, the system says, “temperature is too low!”

• if T > 12, the system says, “temperature is too high!”

You want to use the 3-point boundary value analysis (BVA) to verify the behavior of the control device. A test input is a temperature in °C provided by the device.

What is the MINIMAL set of test inputs that achieves 100% of the desired coverage?

Select ONE option.

11 / 40

11. Which of the following is a characteristic of experience-based test techniques?

Select ONE option.

12 / 40

12. You are testing a simplified apartment search form which has only two search criteria:

• floor (with three possible options: ground floor; first floor; second or higher floor)
• garden type (with three possible options: no garden; small garden; large garden)

Only apartments on the ground floor have gardens. The form has a built-in validation mechanism that will not allow you to use the search criteria which violate this rule.

Each test has two input values: floor and garden type. You want to apply equivalence partitioning (EP) to cover each floor and each garden type in your tests.

What is the minimal number of test cases to achieve 100% EP coverage?

Select ONE option

13 / 40

13. Consider the following testware.

Which test activity produces this testware as an output?

Select ONE option.

14 / 40

14. Which work product can be used by an agile team to show the amount of work that has been completed and the amount of total work remaining for a given iteration?

Select ONE option.

15 / 40

15. You need to update one of the automated test scripts to be in line with a new requirement. Which process indicates that you create a new version of the test script in the test repository?

Select ONE option.

16 / 40

16. Consider the following rule: “for every SDLC activity there is a corresponding test activity”. In which SDLC models does this rule hold?

Select ONE option.

17 / 40

17. Which of the arguments below would you use to convince your manager to organize retrospectives at the end of each release cycle?

Select ONE option.

18 / 40

18. Your team uses planning poker to estimate the test effort for a newly required feature. There is a rule in your team that if there is no time to reach full agreement and the variation in the results is small, applying rules like “accept the number with the most votes” can be applied.
After two rounds, the consensus was not reached, so the third round was initiated. You can see the test estimation results in the table below.

Which of the following is the BEST example of the next step?

Select ONE option.

19 / 40

19. Which of the following is NOT true regarding the test pyramid?

Select ONE option.

20 / 40

20. Which of the following statements BEST describes the acceptance test-driven development (ATDD) approach?

Select ONE option.

21 / 40

21. You work as a tester in a project on a mobile application for food ordering for one of your clients. The client sent you a list of requirements. One of them, with high priority, says

“The order must be processed in less than 10 seconds in 95% of the cases”.

You created a set of test cases in which a number of random orders were made, the processing time measured, and the test results were checked against the requirements.

What test type did you perform?

Select ONE option.

22 / 40

22. Which of the following is NOT an example of the shift left approach?

Select ONE option.

23 / 40

23. Which item correctly identifies a potential risk of performing test automation?

Select ONE option.

24 / 40

24. Which of the following BEST explains a benefit of independence of testing?

Select ONE option.

25 / 40

25. Decide which of the following statements (i-v) are true for static testing.

i. Abnormal external behaviors are easier to identify with this testing
ii. Discrepancies from a coding standard are easier to find with this testing
iii. It identifies failures caused by defects when the software is run
iv. Its test objective is to identify defects as early as possible
v. Missing coverage for critical security requirements is easier to find and fix

Select ONE option.

26 / 40

26. You test a system whose lifecycle is modeled by the state transition diagram shown below. The system starts in the INIT state and ends its operation in the OFF state.

What is the MINIMAL number of test cases to achieve valid transitions coverage?

Select ONE option.

27 / 40

27. During risk analysis the team considered the following risk: “The system allows too high a discount for a customer”. The team estimated the risk impact to be very high.

What can one say about the risk likelihood?

Select ONE option.

28 / 40

28. Which of the following skills (i-v) are the MOST important skills of a tester?

i. Having domain knowledge
ii. Creating a product vision
iii. Being a good team player
iv. Planning and organizing the work of the team
v. Critical thinking

Select ONE option.

29 / 40

29. In your project there has been a delay in the release of a brand-new application and test execution started late, but you have very detailed domain knowledge and good analytical skills. The full list of requirements has not yet been shared with the team, but management is asking for some test results to be presented.

Which test technique fits BEST in this situation?

Select ONE option.

30 / 40

30. Which types of failures (1-4) fit which test levels (A-D) BEST?

1. Failures in system behavior as it deviates from the user’s business needs
2. Failures in communication between components
3. Failures in logic in a module
4. Failures in not correctly implemented business rules

A. Component testing
B. Component integration testing
C. System testing
D. Acceptance testing

Select ONE option.

31 / 40

31. Which of the following is an example of how product risk analysis influences thoroughness and scope of testing?

Select ONE option.

32 / 40

32. How do testers add value to iteration and release planning?

Select ONE option.

33 / 40

33. What task may management take on during a formal review?

Select ONE option.

34 / 40

34. Your test suite achieved 100% statement coverage. What is the consequence of this fact?

Select ONE option.

35 / 40

35. Which of the following statements describe a valid test objective?

Select ONE option.

36 / 40

36. During a risk analysis the following risk was identified and assessed:

• Risk: Response time is too long to generate a report
• Risk likelihood: medium; risk impact: high
• Response to risk:

o An independent test team performs performance testing during system testing
o A selected sample of end users performs alpha and beta acceptance testing before the release

What measure is proposed to be taken in response to this analyzed risk?

Select ONE option.

37 / 40

37. You have been assigned as a tester to a team producing a new system incrementally. You have noticed that no changes have been made to the existing regression test cases for several iterations and no new regression defects were identified. Your manager is happy, but you are not. Which testing principle explains your skepticism?

Select ONE option.

38 / 40

38. Which TWO of the following tasks belong MAINLY to a testing role?

Select TWO options.

39 / 40

39. You are testing a system that calculates the final course grade for a given student.

The final grade is assigned based on the final result, according to the following rules:

• 0 – 50 points: failed
• 51 – 60 points: fair
• 61 – 70 points: satisfactory
• 71 – 80 points: good
• 81 – 90 points: very good
• 91 – 100 points: excellent

You have prepared the following set of test cases:

What is the 2-value Boundary Value Analysis (BVA) coverage for the final result that is achieved with the existing test cases?

Select ONE option.

40 / 40

40. Which of the following BEST describes the concept behind error guessing?

Select ONE option.

0%

Scroll to top