ISTQB Learning

Test your knowledge

0%
73
Created on By Admin

Exam 1 - 75 minutes

1 / 40

1. Consider the following testware.

Which test activity produces this testware as an output?

Select ONE option.

2 / 40

2. Your test suite achieved 100% statement coverage. What is the consequence of this fact?

Select ONE option.

3 / 40

3. You are testing a mobile application that allows users to find a nearby restaurant based on the type of food they want to eat. Consider the following list of test cases, priorities (i.e., a smaller number means a higher priority), and dependencies:

Which of the following test cases should be executed as the third one?

Select ONE option.

4 / 40

4. Which of the following statements about branch testing is CORRECT?

Select ONE option.

5 / 40

5. Which of the following BEST describe the collaborative approach to user story writing?

Select ONE option.

6 / 40

6. Which of the following options shows an example of test activities that contribute to success?

Select ONE option.

7 / 40

7. You are working as a tester in the team that follows the V-model. The choice of software development lifecycle (SDLC) model impacts the timing of testing, which of the following statement is NOT true?

Select ONE option.

8 / 40

8. In your project there has been a delay in the release of a brand-new application and test execution started late, but you have very detailed domain knowledge and good analytical skills. The full list of requirements has not yet been shared with the team, but management is asking for some test results to be presented.

Which test technique fits BEST in this situation?

Select ONE option.

9 / 40

9. Which of the following is a benefit of early and frequent feedback?

Select ONE option.

10 / 40

10. Which work product can be used by an agile team to show the amount of work that has been completed and the amount of total work remaining for a given iteration?

Select ONE option.

11 / 40

11. Which of the following BEST describes the concept behind error guessing?

Select ONE option.

12 / 40

12. The following list contains risks that have been identified for a new software product to be developed:

i. Management moves two experienced testers to another project
ii. The system does not comply with functional safety standards
iii. System response time exceeds user requirements
iv. Stakeholders have inaccurate expectations
v. Disabled people have problems when using the system

Which of them are project risks?

Select ONE option.

13 / 40

13. Which types of failures (1-4) fit which test levels (A-D) BEST?

1. Failures in system behavior as it deviates from the user’s business needs
2. Failures in communication between components
3. Failures in logic in a module
4. Failures in not correctly implemented business rules

A. Component testing
B. Component integration testing
C. System testing
D. Acceptance testing

Select ONE option.

14 / 40

14. Which of the following BEST describes the way acceptance criteria can be documented?

Select ONE option.

15 / 40

15. Which of the following is a characteristic of experience-based test techniques?

Select ONE option.

16 / 40

16. You test a system whose lifecycle is modeled by the state transition diagram shown below. The system starts in the INIT state and ends its operation in the OFF state.

What is the MINIMAL number of test cases to achieve valid transitions coverage?

Select ONE option.

17 / 40

17. Your favorite bicycle daily rental store has just introduced a new Customer Relationship Management system and asked you, one of their most loyal members, to test it.
The implemented features are as follows:

• Anyone can rent a bicycle, but members receive a 20% discount
• However, if the return deadline is missed, the discount is no longer available
• After 15 rentals, members get a gift: a T-Shirt

Decision table describing the implemented features looks as follows:

Based ONLY on the feature description of the Customer Relationship Management system, which of the above rules describes an impossible situation?

 

Select ONE option.

18 / 40

18. Which test activity does a data preparation tool support?

Select ONE option.

19 / 40

19. A wine storage system uses a control device that measures the wine cell temperature T (measured in °C, rounded to the nearest degree) and alarms the user if it deviates from the optimal value of 12, according to the following rules:

• if T = 12, the system says, “optimal temperature”

• if T < 12, the system says, “temperature is too low!”

• if T > 12, the system says, “temperature is too high!”

You want to use the 3-point boundary value analysis (BVA) to verify the behavior of the control device. A test input is a temperature in °C provided by the device.

What is the MINIMAL set of test inputs that achieves 100% of the desired coverage?

Select ONE option.

20 / 40

20. Your team uses the three-point estimation technique to estimate the test effort for a new high-risk feature. The following estimates were made:

• Most optimistic estimation: 2 person-hours
• Most likely estimation: 11 person-hours
• Most pessimistic estimation: 14 person-hours

What is the final estimate?

Select ONE option.

21 / 40

21. You work as a tester in a project on a mobile application for food ordering for one of your clients. The client sent you a list of requirements. One of them, with high priority, says

“The order must be processed in less than 10 seconds in 95% of the cases”.

You created a set of test cases in which a number of random orders were made, the processing time measured, and the test results were checked against the requirements.

What test type did you perform?

Select ONE option.

22 / 40

22. Which of the following statements describe a valid test objective?

Select ONE option.

23 / 40

23. Which of the following is NOT a benefit of static testing?

Select ONE option.

24 / 40

24. Which of the following is the BEST example of how traceability supports testing?

Select ONE option.

25 / 40

25. How do testers add value to iteration and release planning?

Select ONE option.

26 / 40

26. In many software organizations the test department is called the Quality Assurance (QA) department. Is this sentence correct or not and why?

Select ONE option.

27 / 40

27. Which of the following is NOT true regarding the test pyramid?

Select ONE option.

28 / 40

28. You are testing a mobile application that allows customers to access and manage their bank accounts. You are running a test suite that involves evaluating each screen, and each field on each screen, against a general list of user interface best practices derived from a popular book on the topic that maximizes attractiveness, ease-of-use, and accessibility for such applications. Which of the following options BEST categorizes the test technique you are using?

Select ONE option.

29 / 40

29. Which of the following BEST explains a benefit of independence of testing?

Select ONE option.

30 / 40

30. Which of these statements is NOT a factor that contributes to successful reviews?

Select ONE option.

31 / 40

31. Which of the following is NOT an example of the shift left approach?

Select ONE option.

32 / 40

32. Consider the following test categories (1-4) and agile testing quadrants (A-D):

1. Usability testing
2. Component testing
3. Functional testing
4. Reliability testing

A. Agile testing quadrant Q1: technology facing, supporting the development team
B. Agile testing quadrant Q2: business facing, supporting the development team
C. Agile testing quadrant Q3: business facing, critique the product
D. Agile testing quadrant Q4: technology facing, critique the product

How do the following test categories map onto the agile testing quadrants?

Select ONE option.

33 / 40

33. Which TWO of the following options are the exit criteria for testing a system?

Select TWO options.

34 / 40

34. What task may management take on during a formal review?

Select ONE option.

35 / 40

35. Which item correctly identifies a potential risk of performing test automation?

Select ONE option.

36 / 40

36. Which of the following skills (i-v) are the MOST important skills of a tester?

i. Having domain knowledge
ii. Creating a product vision
iii. Being a good team player
iv. Planning and organizing the work of the team
v. Critical thinking

Select ONE option.

37 / 40

37. You need to update one of the automated test scripts to be in line with a new requirement. Which process indicates that you create a new version of the test script in the test repository?

Select ONE option.

38 / 40

38. You are testing a simplified apartment search form which has only two search criteria:

• floor (with three possible options: ground floor; first floor; second or higher floor)
• garden type (with three possible options: no garden; small garden; large garden)

Only apartments on the ground floor have gardens. The form has a built-in validation mechanism that will not allow you to use the search criteria which violate this rule.

Each test has two input values: floor and garden type. You want to apply equivalence partitioning (EP) to cover each floor and each garden type in your tests.

What is the minimal number of test cases to achieve 100% EP coverage?

Select ONE option

39 / 40

39. You have been assigned as a tester to a team producing a new system incrementally. You have noticed that no changes have been made to the existing regression test cases for several iterations and no new regression defects were identified. Your manager is happy, but you are not. Which testing principle explains your skepticism?

Select ONE option.

40 / 40

40. You received the following defect report from the developers stating that the anomaly described in this test report is not reproducible.

Application hangs up
2022-May-03 – John Doe – Rejected
The application hangs up after entering “Test input: $ä” in the Name field on the new user creation screen. Tried to log off, log in with test_admin01 account, same issue. Tried with other test admin accounts, same issue. No error message received; log (see attached) contains fatal error notification. Based on the test case TC-1305, the application should accept the provided input and create the user. Please fix with high priority, this feature is related to REQ-0012, which is a critical new business requirement.

What critical information is MISSING from this test report that would have been useful for the developers?

Select ONE option.

0%

Scroll to top